Return to Ortems homepage  

 
>Home >ERP/MES Integrationyoutube

PlannerOne© for Dynamics NAV

 

The revolutionary planning and scheduling component

PlannerOne© for Microsoft Dynamics NAV is the revolutionary scheduling solution that lets NAV2009R2 users access the best planning capabilities in real time, in a single click and at an affordable price.


PlannerOne© was developed using the latest Microsoft technology (Visual Studio 2010, .Net 4) and integrated into the RoleTailored Dynamics NAV client


The PlannerOne© component uses web services to interact with the Dynamics NAV functionality, enabling real-time communications that accommodate the integrity requirements of the ERP business processes.


PlannerOne© is a collaborative component driving fluid information flows between the ERP’s various users: the notification and labeling system adds graphical markers into the schedule to notify the different users of an event or a change (machine down, late delivery, etc.).

 

A collaborative planning tool

The PlannerOne© for Microsoft NAV application was designed natively for a multi-user planning and scheduling process. The RoleTailored client can be used to customize the interface for users based on their roles in the company. PlannerOne© respects this RoleTailored logic by giving all ERP users –based on their roles– access to:

  • Different views of lead-times and bottlenecks to support quick decision-making on production issues (capacity sizing, subcontracting decisions, work order time-shifting, etc.).
  • Interactive planning capabilities and constraint-based finite-capacity scheduling algorithms that are integrated in real time in the Dynamics NAV production process

For example, a sales rep can display the schedule tab on an order screen and view the end date of the work order related to this order.

The scheduler or planner is the main user of this component. They have access to several views:

  • Resources / Work Order Gantt chart
  • Load diagram
  • Sequenced list of resources
why planner one ?


 

Read the article in the Microsoft blog

 

plannerOne microsoft dynamics nav

 

Key benefits

  • Improved customer service level
  • Increased productivity through optimized capacity and set-up times
  • Reduced cycle time and inventory
  • Improved responsiveness through the real-time integration into NAV2009R2
All of the above for a low cost of ownership with fast and easy integration of these advanced capabilities.  

 

Functionality

  • Constraint-based finite-capacity scheduling
    Multi-criteria scheduling based on elementary manufacturing-specific requirements, which can be combined infinitely to create complex requirements in order to meet your manufacturing objectives and constraints.
  • Optimization of set-up times
    For realistic set-up times and groupings during production runs.
  • Graphical and interactive schedules
    Irrespective of the changes made to the schedule or NAV, instantaneous synchronization lets PlannerOne© apply the consequences instantaneously and ensure that the schedule remains achievable and consistent with your manufacturing constraints.
  • Configurable visual markers
    Provide graphical information about a specific constraint on any operation and implement a collaboration process until the problem is solved.
  • Detailed schedule analysis
    Display the load at finite or infinite capacity to detect bottlenecks.
  • Take raw material availability into account by integrating it with the calculation of net requirements.
  • Simulations in a work schedule
  • Key performance indicators and analysis of advances/delays
eureka
Contact Planner One
© 2001-2012 ORTEMS S.A.S. | Planning and scheduling software | Legal notices | Webmaster | Sitemap
www.ortems.com- Français- English- Deutsch- Russia- Italiano- Español- Português